texas oil and gas wells

texas oil and gas wells

Method of this kind of processing is helpful for saving handling time, save cost, but taller to handling the demand of personnel, operate personnel not only the operation technology that should have adroitness, understand the main demand of rotor molded lines and basic technology parameter even.

Divine horse construction and Yaohandier since May 2017, excavate of area of lake of happy heart lake, road and construction of establishment of form a complete set are undertaking in full blast in, the Duotaiyaohandier that construction of Sichuan god horse buys below banner of engineering limited company the project is advanced period major effect is produced in construction.

Article rice shuts a process to undertake static force and indication motivation analysis to pump valve with Ansys/Ls-Dyna software, analysed the carrying capacity that pump valve leaves in high-pressured condition, find out invalidation reason, to raise pump a powerful person or family service life provided academic basis.

The basis is investigated to the boss' questionnaire, the limits of driver monthly pay that can accept in management process boss with 5000~7000 yuan the proportion that hold is the largest.

Be versed in according to machinery of our country mine the findings report to mine of countrywide copper mine shows trade department, the pit shaft bracket of foreland is average year corrode a quantity to be as high as 0.

The operation pattern of ” of “ well factory that laborious factory raised oil deposit getting to collect unifinication east, break break an independence that is unit to adjust with oil deposit, inside amalgamative and same area many break piece, whole is adjusted, cloth well, auger cast.

Use up system of modern society GPS to use more and more extensive, it can realize car real time fixed position, car monitors control, car attempers management, car calls the police deal with, the service such as the car is checked on the net.

Contacto