geothermal energy equipment

geothermal energy equipment

Design precision and efficiency to rise, shorten the design is periodic, the inducer that development went a function to perfect is hydraulic design software and software of 3 dimension modelling.

Nature of ore of zinc of Guangdong some lead is complex, plumbic zinc is mineral and accrete the relationship is close, detached difficulty is great, should obtain concentrate of high grade lead, zinc must fine grind, and oxidation of this ore lead is led and contain charcoal to measure all taller, mineral to lead floatation affects grade of lead of concentrate of bigger, lead to rise hard.

Filter core can be cleaned 6 times at most outside, must change next.

Bucket capacity: 38.

Contacto